coil packing machine is in excess of

Requirements

20 x 2000 slitting line for slitting stainlesss steel coils of optimum 20mm thickness and max 2000mm thickness.

20 x2000 slitting collection for slitting stainlesss steel coils of optimum 20mm max and thickness 2000mm breadth

Coil fabric: carbon dioxide stainlesss steel Q235, Q345

Coil breadth: 1000-2000mm

Coil thickness: 5-20mm

Coil Identification: , 760mm610mm and 508mm

Coil OD: 2000mm

Coil weight: optimum 40T

Slitting range method orbital stretch wrapper:

Coil loading auto, dual mandrel decoiler, coil brain guideline click-down and shovel, twice curler feeding and five curler progressing, key aligning, coil conclusion cutter, transmission roll desk, area guide, disc shearing machine, scrapaccumulator and collector, pre-separator, tensioner, measuring curler, separator recoiler, coils discharging auto, hydraulic control, electronic handle

Outline of each unit:

Coil launching car

4KW cycloid engine, φ250 x 700 hydraulic cylinder

A few phase, twice mandrel decoiler

φ460-508mm, 560-610mm, 710-760mm

The dimensions of coil advantage baffle: Φ2000×40mm

Increase roller providing and 5 curler flattener

worm wheel and rod, two motors for demanding downward: 2.2kw

crunch feeding and leveling motor: AC45kw

Side guide:

two couples aspect guideline rollers: Φ200×250mm

Disc shearing machine

maximum shearing number: 6-7mm size 12strips, 8-10mm thickness 8 strips, 11-12mm 6 strips, 14mm 5strips, 16mm 4strips, 20mm 3 strips.

disc shearing shaft: φ360 by2100 and 40Cr, HRC52°~55°

Disc cutter: D600 by d360 xT50mm and 6CrW2Si, HRC 54-56

Motor: 200KW engine.

Slitting velocity: 30m/min maximum stepless change

Recoiler

Recoiling block: φ760 x 2100

coils hit shaft: φ200 by 2100

Recoiling motor: 250KW

Hydraulic tube for assist coils: φ125×500mm

Hydraulic cylinder for coils forcing out: Φ80×1700mm

Strips isolating discs: D250 by d110 x T10/20mm, 65Mn.

Payment

Down payment: 30% of complete quantity for creating contract successful;others to get paid for at the time of shipping

Warrantee period of time:

12 months after commissioning except for the malfunctions’ issues manufactured by customer.

Shipping and delivery, Installing And Commissioning

Supply base sketching inside a 30 days following agreement validation; delivery time: 120 times; Installing & commissioning: 30 days

If customer needs us to send engineers to his factory, usually we send three engineers.

Customer should get installation conditions ready before our engineers go to his factory.

Client ought to keep air accommodation, food and tickets along with nearby transport of the designers, and pay out each and every expert 50usd/time for function.

You may also like...